Vanuatu
 

Brenwe River Mini-Hydropower Plant in Malekula (PIN/PDD)

The project will build a run-of-river hydropower plant along the Benwe River in the Malekula Island. Electricity generated will be supplied to the local grid.

Project Idea Note (PIN)

Project Design Document (PDD)

    Description: 
    The plant will have an installed capacity of 1.2 MW and a use life of 25 years. The project activity will help improve electricity access in rural areas.

    Project facts

    Country:  Vanuatu

    Project Type:  Renewable Energy – Mini Hydro Power

    Project size:  Large

    CERs/Year:  4,271 tCO2e/year (29,687 tCO2e for the first 7-year crediting period)

    Contact:  Leo Moli, lmoli(at)vanuatu(dot)com(dot)vu or Benjamin Jesse, benjaminjes(at)gmail(dot)com

    Status:  Pre-feasibility Study finished




    Disclaimer
    This website has been produced with the assistance of the European Union