Phase 1 of the project will build a geo-thermal power plant in the Efate Island. Electricity generated will be supplied to the local grid.

Project Idea Note (PIN)

Project Design Document (PDD)

    Description: 
    The plant will use the geothermal resource at Takara and have an installed capacity of 5 MW. The project activity will help improve electricity access in rural areas. Currently 90% of the electricity supplied by the local grid is produced by diesel generators.

    Project facts

    Country:  Vanuatu

    Project Type:  Renewable Energy – Geothermal

    Project size:  Small scale

    CERs/Year:  19,237 tCO2e/year (134,659 tCO2e for the first 7-year crediting period)

    Contact:  Tim Hewatt, Kuth Energy Ltd, tim(dot)hewatt(at)kuthenergy(dot)com

    Status:  Pre-feasibility Study finished